1、Excavator operation technology

First, confirm the surrounding conditions. During slewing operation, be aware of the surrounding obstacles and terrain and operate safely; During operation, confirm the front and rear direction of the track to avoid overturning or impact; Try not to face the final drive to the excavation direction, otherwise it is easy to damage the traveling motor or hose; During operation, the left and right tracks shall be fully contacted with the ground to improve the dynamic stability of the whole machine.


1(8).jpg


2、Effective excavation method for excavator operation

When the bucket cylinder and the connecting rod, the stick cylinder and the stick form 90 degrees to each other, the digging force *; When the bucket tooth keeps an angle of 30 degrees with the ground, the digging force *, that is, the soil cutting resistance, is the minimum; When digging with a stick, ensure that the angle range of the stick is 45 degrees from the front to 30 degrees from the back. Using the boom and bucket at the same time can improve the digging efficiency.

3、Excavator operated rock excavation

The use of bucket to excavate rocks will cause great damage to the machine, which should be avoided as far as possible; When it is necessary to excavate, the position of the machine body shall be adjusted according to the crack direction of the rock, so that the bucket can be shoveled in smoothly for excavation; Insert the bucket teeth into the rock cracks, and excavate with the digging force of the bucket handle and bucket (pay attention to the slippage of the bucket teeth); Rock that has not been broken shall be broken first and then excavated with bucket.

4、Slope leveling operation by excavator

During the plane trimming, the machine shall be laid flat on the ground to prevent the machine body from shaking. It is important to grasp the coordination of the boom and the stick, and control the speed of both is essential for the plane trimming.

5、Loading operation for excavator operation

The machine body shall be in a horizontal and stable position, otherwise it is difficult to accurately control the slewing unloading, thus prolonging the operation cycle time; Keep a proper distance between the engine body and the truck to prevent the rear of the engine body from colliding with the truck when turning 180 degrees; The left slewing installation shall be carried out as far as possible, which has wide vision and high operation efficiency. At the same time, the rotation angle shall be correctly controlled to reduce the time used for slewing; The truck position is lower than the excavator to shorten the lifting time of the boom, and the vision is good; Sand and gravel shall be loaded first, and then large stones shall be placed to reduce the impact on the car body.

6、Excavator operation in soft area or water

When working in the soft soil zone, it is necessary to know the degree of soil looseness, and pay attention to limiting the excavation range of the bucket to prevent landslide, collapse and other accidents as well as the deep sinking of the car body. When working in water, pay attention to the allowable water depth range of the vehicle body (the water surface should be below the carrier roller *); If the horizontal plane is high, poor lubrication will occur in the slewing ring due to the water entering, the engine fan blades will be damaged due to the water hitting, and the electrical circuit components will be short circuited or open circuited due to the water intrusion.

7、Hoisting operation for excavator operation

When using hydraulic excavator for hoisting operation, confirm the surrounding conditions of the hoisting site, use high-strength hooks and wire ropes, and try to use special hoisting devices during hoisting; The operation mode shall be micro operation mode, and the action shall be slow and balanced; The length of the lifting rope is appropriate. If it is too long, the swing of the lifting object will be large and difficult to control accurately; The bucket position shall be adjusted correctly to prevent the steel wire rope from slipping; The construction personnel shall not be close to the hoisted objects as much as possible to prevent danger due to improper operation.



Tel    +86 15821397440

Email    15821397440@163.com

Adress    Room 7011, Building D, Youkou Park, No. 377, Chengpu Road, Fengxian District, Shanghai 201401 China

Copyright 2014-2025    All rights reserved


官方微信


Mob.:+86 15821397440

Address: Building 2, No. 579, Dongxing Road, Songjiang District,Shanghai, 201613 China



E-mail: kevin.gao@shsq-bar.com

               kevin.gao@shanghai-bar.com


Whatsapp/Wechat:+86 15821397440


Shanghai Shengqing Import and Export Co., Ltd

seo seo